Do solar panels need building regulations approval?

Published 8 November 2026

Yes, in almost every case, but you don't usually apply for it yourself. Fitting solar panels to a house in England counts as building work under the Building Regulations 2010, because the panels add weight to the roof and their wiring comes under the electrical safety rules, and wiring them in on a new circuit is notifiable work. If your installer is registered with a competent person scheme for renewable systems, they certify the work themselves and tell the council, and you should get a certificate. If they aren't registered, you, or they on your behalf, must apply to building control before the work starts. Planning permission is a separate question, and most home installations don't need it.

Why the building regulations apply

The Building Regulations 2010, regulation 3, defines building work to include providing a "controlled service or fitting" and the "material alteration" of a building. Solar panels are caught in two ways:

The usual route: a registered installer

You don't need to tell building control yourself if the work is done by someone registered for that type of work with a competent person scheme (regulation 12(6)(a)). The list of work and schemes is in Schedule 3. The entry that covers solar panels is paragraph 15, the "installation in a building of a system to produce electricity, heat or cooling" by microgeneration or from renewable sources. The schemes authorised for it are run by APHC, BESCA, Certsure, HETAS, NAPIT and OFTEC.

Two things in that list catch people out:

Under regulation 20, a registered installer must, within 30 days of finishing, give the occupier a copy of a certificate that the work complies and give building control either a notice or the certificate. GOV.UK's page on using a competent person scheme says you will get the certificate within 8 weeks of completion, which allows for the scheme sending it on. The certificate is evidence, though not conclusive evidence, that the work meets the regulations, and GOV.UK says it will appear in solicitors' searches when you sell.

To check an installer before you sign, search the Competent Persons Register at competentperson.co.uk (which now redirects to the Front Door "Find a competent person" search) or the Electrical Competent Person Register, both linked from GOV.UK, or ask the installer which scheme they're registered with for renewables and look them up on the scheme's own site.

If your installer isn't registered

Then regulation 12(2) applies: before work starts, someone must give your council's building control a building notice or an application with full plans. Building control then inspects the work. Ask the installer who will make the application, and get it in writing. GOV.UK's building regulations approval page explains the choices and how to find your building control body.

If the work was done without either

Contravening the building regulations is an offence under section 35 of the Building Act 1984, and if the work doesn't comply, section 36 lets the council require the owner to take it down or alter it, up to 10 years after it was finished. GOV.UK also warns that you may not have the certificates you need when you sell.

If your panels were fitted without a certificate, you can:

What this page doesn't cover

This page sets out the rules as published. It isn't legal advice. If you are unsure about a particular job, ask your council's building control team.