Can you add a battery to solar panels on the Feed-in Tariff?

Published 13 November 2026

Yes. Ofgem says a battery can be added to a Feed-in Tariff (FIT) installation without affecting its accreditation, so the panels keep their tariff. What decides whether the payments carry on is the metering: the generation meter must still record only what the panels make, not electricity that went into the battery from the grid. If the battery charges only from the panels, or is wired in after the generation meter, both the generation payments and the usual deemed export payments continue. Either way you have to tell your FIT supplier, with a wiring diagram and, for most home systems, a signed declaration from you and your installer (Ofgem, FIT guidance for generators, version 19, 1 April 2026, paragraphs 3.25 to 3.29).

Why the meter matters

FIT generation payments are made on the generation meter reading, and that reading must measure the electricity the panels generate separately from any other source; estimates can't be used (FIT guidance for generators, paragraphs 6.6 and 6.16). A battery that can charge from the grid is another source. If grid electricity can pass through it and then through the generation meter, the meter would count electricity the panels never made, and Ofgem says that in that case no generation payments can be made (Ofgem, co-location guidance, version 6.2, 23 May 2025, paragraphs 3.8 and 3.16).

Ofgem's co-location guidance sets out two ways to meet the rule. Either the set-up makes it plain, because the battery can only charge from the panels or sits after the generation meter, or the generation meter is a single approved "bi-directional" meter that measures what goes in and out and itself shows a net figure. Working out a net figure from two separate meters isn't allowed (co-location guidance, paragraphs 3.10 to 3.14).

Which set-ups keep the payments

Systems of 30kW or less whose export isn't measured by an export meter are paid for export on a deemed basis (FIT guidance for generators, paragraph 6.8): no export meter reading is used, and export is taken to be 50% of the generation meter reading for solar panels in the FIT year to 31 March 2027 (DESNZ, FIT determinations, year 17). Because deemed export is worked out from the generation reading, it carries on wherever the generation reading still counts (co-location guidance, paragraph 3.18). Ofgem's worked examples for home systems give these results:

How the battery is fittedGeneration paymentsDeemed export
After the generation meter, whether or not it charges from the gridContinueContinue
Before the generation meter, sharing the solar inverter, with the inverter set so it can't charge from the gridContinueContinue
Before the generation meter, able to charge from the grid, with an approved bi-directional generation meterContinueContinue, if the other deemed export conditions are met
Before the generation meter, able to charge from the grid, with an ordinary generation meterStopStop, as it depends on the generation reading

Sources: co-location guidance, scenarios 4.1, 4.6 and 4.8, and paragraphs 3.16 and 3.18. Ofgem says each case is assessed on its own facts, and its examples don't cover every possible set-up.

Two things can still reduce the payments a little. A battery before the generation meter loses some energy as it charges and discharges, so the meter can record less, and with a bi-directional meter the reading is a monthly net figure: if more went in than came out in a month, there is nothing to claim for that month (co-location guidance, paragraphs 3.27 and 3.28).

Ofgem also notes that most smart meters are not "bi-directional meters" in its sense: they measure import and export, but don't show a net value (co-location guidance, paragraph 3.30). A smart meter doesn't turn an ordinary generation meter into one that qualifies.

If you're paid on metered export

Some FIT systems are paid on an export meter reading instead. Then the export meter must also measure only the panels' export. If the battery can charge from the grid and also send electricity out, an ordinary export meter can't tell the two apart, and Ofgem says no metered export payments can be made; generation payments can continue, and the system may be able to fall back to deemed export if it qualifies (co-location guidance, scenario 4.2). A battery that can only charge from the panels, for example with a relay that stops it charging whenever the home is importing, keeps both generation and metered export payments (scenario 4.9).

What to send your FIT supplier

Adding a battery has to be reported to your FIT supplier (Ofgem calls it the FIT licensee) under your statement of FIT terms. Ofgem's guidance says to give them:

(FIT guidance for generators, paragraphs 3.27, 3.28 and 3.30.) For ordinary home systems, accredited through MCS, Ofgem also asks for signed declarations, printed in Appendix 1 of the co-location guidance: declarations 1a and 1b, from you and the installer, if the battery can't charge from the grid, or 2a and 2b, saying where the generation meter is, if it can (FIT guidance for generators, paragraph 3.29). Systems above 50kW, accredited by Ofgem under ROO-FIT, must also update their accreditation with Ofgem.

Ofgem recommends that batteries up to 50kW are fitted by an MCS-certified installer, to the MCS Battery Standard (FIT guidance for generators, paragraph 3.26). A battery also has to be notified to your electricity network operator, and some solar-and-battery systems need its approval before they're fitted; our page on network operator permission explains when.

Before you buy

Ask the installer three things in writing: whether the battery will sit before or after your generation meter (FIT supplier Good Energy, for example, describes a battery with its own inverter, fitted after the original generation meter, as a simple way to avoid double counting), whether it will be able to charge from the grid, and which of Ofgem's declarations they will sign. If you want the battery to charge from the grid, for example on a cheaper overnight tariff, it needs to be after the generation meter, or before it with a qualifying bi-directional meter. If anything is unclear, ask your FIT supplier before the work is done; Ofgem says its guidance isn't a definitive legal guide and that generators should take their own technical advice before changing an installation (co-location guidance, introduction).