Do new build homes have to have solar panels?

Published 11 November 2026

Not yet. In England, a new legal requirement for new homes to be built with their own renewable electricity, which in practice means solar panels, comes into force on 24 March 2027, under the Building Regulations etc. (Amendment) (England) Regulations 2026. Even then it won't cover every new home at once: a home whose building control notice or plans went in before 24 March 2027 can still be built to the old rules, without panels, as long as work on that building starts before 24 March 2028. Blocks of flats with a storey 18 metres or more above the ground are exempt, and so are homes where panels couldn't produce a reasonable output. The rule doesn't apply in Wales, Scotland or Northern Ireland, and it doesn't apply to homes that already exist.

What the new rule says

The regulations add a new requirement, called L3, to the Building Regulations. It says that when a building is put up that is or contains one or more homes, a system for on-site renewable electricity generation must be installed on the building or within its boundaries. The system has to:

The law doesn't say "solar panels" or set a size. That comes from the government's guidance. Its response to the Future Homes and Buildings Standards consultation (March 2026) says the requirement will be met if solar panels covering the equivalent of 40% of each home's ground floor area are installed, though builders can meet it in other ways. The guidance in Approved Document L gives examples of design features, such as roof shapes and rooflights, where less than 40% is still reasonable.

When it starts, and why some 2028 homes won't have panels

The regulations come into force on 24 March 2027. The transitional rules work building by building, not across a whole development:

So a large estate can have homes built to both standards side by side, and a home that is finished, or sold new, well after March 2028 may have been started in time to be built without panels. Reports that panels "are now compulsory on all new homes" are wrong on both counts: the rule isn't in force yet, and it has exceptions.

For high-rise and other higher-risk buildings, the regulations come into force on 24 September 2027 instead, with their own transitional rules, but most of those buildings are exempt from the solar requirement anyway (see below).

Which homes are exempt

Requirement L3 doesn't apply to a building:

What it doesn't cover

If you're buying a new build

Ask the developer whether the home is being built to the 2027 standards or under the transitional rules, and, if it has panels, what size the system is and whether a battery is included. The 40% guidance is a minimum route to compliance, not a promise of a large system: a small roof means a small array. If you want to earn from the electricity you export, our page on export payments explains the Smart Export Guarantee. Building your own home? The rule applies to self-built homes too, and your building control body can tell you which standards your project falls under.