Do you need planning permission for solar panels?

Published 5 November 2026

Usually not, if you live in a house in England. Panels on the roof, a wall or the garden of a house are "permitted development", which means planning permission is already granted by law, as long as they stay within set limits: on a pitched roof, no more than 0.2 metres proud of the roof and no higher than its highest point (chimneys aside). You do need planning permission if the house is listed, if the site is a scheduled monument, if your council has removed the rights with an article 4 direction or a planning condition, or if the panels go beyond the limits. The limits for walls, balconies and garden panels changed on 27 August 2026, and most of them got looser.

Where the rules come from

Permitted development for solar on homes is set out in Part 14 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015. Class A covers panels on a building, and Class B covers "stand-alone" panels in the garden or grounds. Both were rewritten for houses by the General Permitted Development (England) (Amendment) Order 2026, made on 29 July 2026, which came into force on 27 August 2026. Since then, houses and blocks of flats have separate lists of limits.

The figures below are for a house (the law's word is "dwellinghouse"), and for a building in its grounds, such as a garage or shed.

Panels on the house: the limits

Where the panels goLimit without planning permission
Pitched roofNo more than 0.2m beyond the roof slope, and no part higher than the highest part of the roof, not counting a chimney
Flat roofNo part more than 0.6m above the highest part of the roof, not counting a chimney
Wall next to a road (the law says a highway)No more than 0.2m beyond the wall
Any other wallNo more than 0.4m beyond the wall
Balcony railing, or a balustrade or parapet on the roof0.2m where it is next to a road, 0.4m otherwise

Panels on a house are not permitted development at all if:

Two conditions apply to every installation: the panels must, as far as practicable, be sited to minimise their effect on how the building looks and on the amenity of the area, and they must be removed as soon as reasonably practicable when no longer needed (paragraph A.2).

One case needs a short application first. If the panels go on a flat roof and the house is on "article 2(3) land", you must ask the council whether it wants to approve their appearance before you start. That is a prior approval application, not full planning permission. Article 2(3) land, defined in Schedule 1 to the Order, means a conservation area, an area of outstanding natural beauty, a National Park, the Broads, a World Heritage Site, or land specified under section 41(3) of the Wildlife and Countryside Act 1981.

Panels in the garden

A stand-alone array in the grounds of a house, on a frame or on the ground, is permitted development if the panels add up to no more than 9 square metres and no part is higher than the lowest limit that applies:

Where the array standsHeight limit
Within 5m of the boundary and in front of the main front wall of the house1m
Within 5m of the boundary, anywhere else2m
In a conservation area, nearer a road that bounds the property than the house is2m
Anywhere else4m

It is not permitted development in the grounds of a listed building, on a scheduled monument, or, in a World Heritage Site, nearer a bounding road than the house or within 5m of the boundary. Plug-in solar can't be fixed to a wooden fence, gate, wall or other enclosure.

Before 27 August 2026 a house could have only one stand-alone array, no dimension of it, housing included, could be more than 3m, and none of it could be within 5m of the boundary. The new list for houses has none of those three limits, which still apply to blocks of flats. A stand-alone array needs a prior approval application before you start if it is in a conservation area and nearer a bounding road than the house, or on article 2(3) land and within 5m of the boundary (paragraph B.2).

Plug-in and balcony solar

The 2026 Order brought plug-in solar, which it defines as panels meant to connect to a home's wiring "by means of a standard plug and socket", into the same rules. So a plug-in panel on a balcony or wall is permitted development within the limits above, except on timber. These are planning rules only. They don't say whether a particular kit is safe or meets electrical rules, so check that separately before you buy one.

When you will need planning permission

If you aren't sure whether your plans are within the rules, you can ask the council for a lawful development certificate, which the planning practice guidance (paragraph 024) describes as a legally binding decision. It is optional.

If you planned under the old rules

Article 6 of the 2026 Order lets work that was permitted development before 27 August 2026, but isn't now, still go ahead under the old rules until the end of 26 August 2027.

What permitted development doesn't cover

This page sets out the rules as published. It isn't legal advice. If your case is unusual, ask your council's planning team or a planning professional.

Sources

Checked on 4 November 2026.