Can you get paid for the electricity your plug-in solar exports?
Published 7 November 2026
Usually not. The Smart Export Guarantee (SEG), the scheme that makes suppliers pay for electricity homes send back to the grid, needs two things most plug-in solar kits don't have: an installation and installer certified under the Microgeneration Certification Scheme (MCS) or an equivalent, and a meter that records your export half-hourly, with its own export number. The government's own impact assessment for plug-in solar (July 2026) says that without an MCS-accredited installation, domestic solar consumers are not entitled to the SEG, and that the conditions are likely not to be met, at first, by many people fitting plug-in solar. So any electricity your kit pushes out to the grid usually earns you nothing. The saving comes from the electricity you use at home instead of buying it.
What the Smart Export Guarantee requires
Ofgem's guidance for generators says that for an installation to be eligible, every application must:
- show the installation and installer are suitably certified. For solar up to 50kW that may be an MCS certificate, but the SEG also recognises schemes equivalent to MCS. Without an MCS certificate, the installation and installer should be accredited to EN 45011 or EN ISO/IEC 17065:2012;
- have an export meter, capable of half-hourly readings, at the point where the installation connects to the grid. A smart meter may already be able to do this;
- have an export MPAN, the 13 digit number that identifies an export connection. It is different from the import MPAN on your bill, and the SEG supplier arranges it.
The installation must also be in Great Britain (Ofgem, SEG generators), so the SEG isn't available in Northern Ireland. On GOV.UK's summary, the scheme names MCS as the certification you need to show.
Why a plug-in kit usually falls short
The law that allowed plug-in solar from 27 August 2026 rests on the government's interim product specification, a set of rules for the product, not for who fits it. You plug the kit in yourself, so there is no certified installer and no MCS certificate for the installation. A product that meets the specification is legal to use, but meeting it doesn't make the installation eligible for the SEG. Our page on whether plug-in solar is legal sets out the specification's conditions.
The impact assessment also expects export to be small anyway. With an 800 watt cap on what the kit can put into your wiring, it says most of the power is expected to be used within the home, leaving modest power for export.
What happens to the electricity you don't use
When your kit makes more than the house is using at that moment, the surplus flows out to the grid. Without a SEG tariff, nobody pays you for it. The government's response to its plug-in solar consultation records that respondents asked for SEG reform and "clearer arrangements for exported electricity", but it announced no change to the SEG. You still have to tell your network operator about the kit, which is a separate duty from the SEG and earns nothing; our page on telling the network operator explains it.
So the way to get value from a plug-in kit is to use its electricity while it is generating, for example by running a washing machine or dishwasher in the middle of a sunny day.
If export payments matter to you
- Ask a SEG supplier about your kit. Ofgem's guidance says to speak to your chosen SEG supplier to find out exactly what information it needs, and suppliers decide whether an installation is eligible. A supplier can accept a scheme it judges equivalent to MCS, but don't assume a plug-in kit's paperwork will count.
- Know which suppliers must offer the SEG. A supplier with at least 150,000 domestic electricity customers on 31 December of the year before must offer a SEG tariff; smaller suppliers may choose to (Ofgem, electricity suppliers). Your SEG supplier doesn't have to be the one that sells you electricity, and Ofgem keeps a list of SEG suppliers. Each sets its own rate, which must stay above zero.
- Consider a fitted system. Rooftop or wall panels fitted by an MCS-certified installer come with the certificate the SEG asks for. Our pages on planning permission and VAT on solar panels cover the other rules for those.
- Not on the old Feed-in Tariff. You can't get a SEG tariff while you are receiving Feed-in Tariff export payments for the same installation.
Sources
- Department for Energy Security and Net Zero, Plug-in solar: final stage impact assessment, July 2026.
- Department for Energy Security and Net Zero, Plug-in Solar Device Interim Product Specification, version 2.0, July 2026, and the consultation and government response.
- Ofgem, Smart Export Guarantee: guidance for generators, SEG generators and SEG electricity suppliers.
- GOV.UK, Smart Export Guarantee: earn money for exporting the renewable electricity you have generated.