Can you install a home EV charger yourself?

Published 14 November 2026

In England, the law doesn't require a professional, but it does require the work to be certified, and you can't certify it yourself. Fitting a home charger means a new circuit, which is notifiable work under the building regulations. If you aren't a registered electrician, you must either tell your council's building control (or a private building control approver) before you start, and let it inspect the work, or appoint a registered third-party certifier before you start. Doing it yourself also rules out the government's chargepoint grant, which only pays through an authorised installer. Wales, Scotland and Northern Ireland have their own rules. This page was checked against the regulations and GOV.UK on 13 November 2026, and it describes the rules rather than whether you have the skills: if you aren't a qualified electrician, use one.

Why a charger counts as notifiable work

Part P of the Building Regulations 2010 covers electrical safety in homes, and regulation 12(6A) makes three kinds of electrical work notifiable in England: installing a new circuit, replacing a consumer unit, and adding to or altering circuits in the space around a bath or shower. The Planning Portal's building regulations guide for EV chargers says building regulations approval is always needed for a home charger, because it involves a new circuit. It also says it's up to the householder, not the installer, to make sure the right approvals are in place.

The three ways to get the work certified

Approved Document P, the government's guidance on Part P, sets out three routes (paragraph 3.1):

Who does the workHow it's certifiedWhen you must act
An electrician registered with a competent person schemeThey self-certify, and their scheme sends a compliance certificate to you and building control within 30 daysNothing for you to file
Anyone else, using a registered third-party certifierThe certifier inspects and tests the work, and its registration body sends the certificate within 30 daysAppoint the certifier before work begins, and tell it within 5 days of finishing
Anyone else, using building controlThe building control body decides what inspection and testing it needs, then issues a completion or final certificateNotify building control before work begins

For the third-party route, schedule 3A to the regulations names one body for electrical work in homes in England: people registered for it by NAPIT Registration Limited. For the building control route, the Planning Portal says you can notify with a building notice or a full plans application, and that work can start two days after the notice goes in. Councils set their own fees, and Approved Document P (paragraphs 3.10 and 3.11) says a council can charge less if you're competent to test the work yourself and give it the BS 7671 certificate.

Whichever route you use, Approved Document P says the work should be designed, installed, inspected and tested to BS 7671, the national wiring regulations.

What you lose by doing it yourself

The charger's warranty and your home insurance may also depend on who fitted it; check the manufacturer's terms and your policy before you start.

If you skip the certification

GOV.UK says the person doing the work could be prosecuted and fined for not complying with the building regulations, and that building control could make you pay to fix faulty work. Approved Document P (paragraph 3.14) adds that councils can take enforcement action over unsafe electrical work even where it isn't notifiable. If a charger is already in and you don't know whether it was certified, the Planning Portal suggests asking your council's building control, or the registered electrician who fitted it.

Wales, Scotland and Northern Ireland

Sources